Make-Good Strip-Outs in Brisbane: Returning an Office, Shop or Warehouse at Lease End

When a business moves out of a Brisbane office, shop or warehouse, the last big job is often the one nobody budgeted for: the make-good. Most commercial leases require the tenant to return the premises to an agreed condition, and that usually means removing the fit-out that was installed years earlier. Done well, a make-good strip-out gets the bond or bank guarantee back on time and avoids a dispute with the landlord. Done badly, it means rework, holding costs and arguments over what the lease actually said.

Start with the lease, not the building

The make-good clause decides the scope. Two neighbouring tenancies in the same Fortitude Valley building can have completely different obligations, so read your own lease closely. Common requirements include:

  • Return to base building condition, meaning the landlord's original shell, ceilings, lighting and services, with the tenant's additions removed
  • Remove all tenant fit-out, including partitions, joinery, signage, data cabling and floor coverings
  • Repair and repaint, patching holes, making good damaged surfaces and repainting to a specified finish
  • Leave in place items the landlord wants to keep, which should be confirmed in writing

If the wording is vague, ask the landlord or their building manager to confirm the expected end condition before demolition starts. A short written scope, ideally walked through on site, is the single best protection against a dispute at handover.

What a typical strip-out removes

The scope varies, but a commercial strip-out in Brisbane commonly includes:

  • Office partitions, glazed suites and doors
  • Kitchenettes, breakout joinery, reception counters and storage
  • Suspended ceiling grids and tiles, where the fit-out added them
  • Carpet tiles, vinyl, raised floors and floor adhesive residue
  • Data and communications cabling back to the agreed point
  • Tenant-installed lighting, power outlets and air-conditioning extensions
  • Signage, shopfronts and display fixtures in retail tenancies

In warehouses around Eagle Farm, Rocklea or Murarrie, the scope may also include mezzanines, racking, cool rooms, office pods and slab penetrations that need to be filled.

Services have to be isolated by the right trades

Strip-out is not just demolition. Before anything comes out, the services that run through the fit-out need to be isolated and made safe:

  1. Electrical circuits disconnected and terminated by a licensed electrician
  2. Plumbing and drainage to kitchens and amenities capped by a licensed plumber
  3. Fire services such as sprinkler heads, detectors and exit lighting handled by a fire protection contractor, so the building's systems keep working
  4. Mechanical ductwork and air-conditioning returned to the base build layout where the lease requires it

Fire services need particular care in multi-tenant buildings. Isolating part of a sprinkler or detection system affects everyone in the building, so it is coordinated with building management and kept as short as possible.

Asbestos and older buildings

Any workplace building constructed before 31 December 2003 is required to have an asbestos register. Ask the landlord or building manager for it before the strip-out is priced. Older Brisbane buildings, particularly those built before 1990, can contain asbestos in vinyl floor tiles and their adhesive, ceiling materials, wall linings, pipe lagging and switchboard backing panels.

If the register is out of date or does not cover the areas being disturbed, a further inspection may be needed. Any asbestos found is removed by an appropriately licensed removalist before the general strip-out goes ahead, which is how our asbestos-aware demolition process works on commercial jobs too.

Working in an occupied building

Most make-good strip-outs happen while the rest of the building keeps trading. That brings rules that a house demolition never has to deal with:

  • Building management approval of the method, insurance and safe work documentation
  • Loading dock and lift bookings, often in set time slots
  • Lift and common-area protection for the whole route debris will travel
  • Noise restrictions, with noisy work sometimes limited to early mornings, evenings or weekends
  • Dust and odour control, so neighbouring tenancies and the air-conditioning system are not affected

In CBD and Newstead towers, after-hours work is common and debris is bagged and moved in small loads.

Time it against the lease end date

Make-good work must normally be finished before the lease expires, or by a date the landlord agrees. Working backwards from that date, allow time for:

  • Getting the landlord's written scope confirmed
  • Obtaining the asbestos register and any additional testing
  • Booking electricians, plumbers and fire services contractors
  • The physical strip-out, waste removal and cleaning
  • Any patching and painting the lease requires
  • A final inspection with the landlord or building manager

Leave time to fix anything the landlord finds at inspection before the lease runs out.

Waste and recycling

Commercial strip-outs produce plenty of material that does not need to go to landfill. Metal partition studs, ceiling grid, cabling and steel racking can usually be recycled, and some furniture and joinery can be sold or donated if it comes out whole. Flag reusable items early so they are removed carefully rather than broken up.

Make-good and full demolition

If the whole building is coming down rather than just one tenancy being returned to shell, the job moves from internal demolition to commercial demolition, with a different approval path and a different method. Where a slab, pits or footings also need to go, concrete and slab removal is added to the scope. We can advise which applies once we have seen the site.

Getting a make-good quote

Send through the address, the tenancy size, a copy of the make-good clause or the landlord's written scope, and the asbestos register if you have it. Photos of each area help too. With that, we can quote the strip-out properly and plan it around your lease date and the building's rules, anywhere across Brisbane, Logan, Moreton Bay and the Redlands.

Need a hand with this?Demolition Brisbane serves Brisbane and surrounds. Free quotes on every job.
Free quotes

Ready to get started?

Tell us about the property · Approvals and asbestos explained · Brisbane, Logan, Moreton Bay & Redlands

Call +61 7 3132 1994